phase 01
INFORMATION COLLECTION, ESTABLISHMENT OF A METHODOLOGY AND SELECTION OF CASES

STUDY CASES
| Area | Number of cases |
|---|---|
| Alicante | 13 |
| Castellón | 36 |
| Valencia | 33 |
| Cuenca | 1 |
| Islas Baleares | 1 |
| Total | 84 buildings |
| Elements | Number of cases |
|---|---|
| Walls | 150 |
| Openings | 148 |
| Roofs | 122 |
| Coatings | 84 |
| Slabs | 11 |
| Floors | 10 |
| Plinths | 5 |
| Partitions | 1 |
| Total | 531 interventions |
Study sheet
General information about the building: geographical, climatic, architectural and constructive data
Information about the interventions: intervened element, previous reflection, compatibility, objective and action
Information about the current condition of the building: material damage and structural damage












